Dunai Nehézrakodó Kft.
The main activity of the port is putting heavy elements into, and removing heavy elements from ships. The maximum lifting capacity is 250 tons.
Berth:
Our port is located in Csepel, on the left bank of the Danube, at river kilometre No. 1637,5
Quay length, vertical:
8 m
Number of terminals:
1
Loading capacity:
250 ton/lot
Contact:
Managing Director:
Kiss Zoltán
Mobile: +36 20 980 8226
E-mail: dnr@dnr.co.hu
Technical information:
Müller Zoltán
Mobile: +36 20 537 4746
E-mail: dnr@dnr.co.hu